L o a d i n g
High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates
Project

ELSEWEDY ELECTRIC CFC DATA CENTER

Category
Datacenter Solutions
Client
Envato
Start Date
7 August 2021
Designer
Ui-ThemeZ

Project overview

• Tier III smart modular data center • Data Centers (phase I) capacity of 14 Racks • Total load of 84 KVA • Total footprint 100 m2 • Passive and active infrastructure network • Highly integrated - including IT cabinets, power supply distribution, cabling and management, firefighting and cooling systems supports flexible and modular deployment

  • Datacenter Solutions

Product making for
friendly users

Duis sed augue condimentum, blandit sapien in, accumsan eros. Curabitur sodales pulvinar libero et venenatis. Nullam eleifend risus a quam dictum auctor. Mauris at leo non dui euismod varius. Cras vel erat at est aliquam laoreet.

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

location

High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates

inquiry

info@elsewedy.com

+971 4 326 7744