L o a d i n g
High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates
Project

The South & East Kuwait (SEK), Burgan Oil Feilds

Category
Oil & Gas and Utilities
Client
Envato
Start Date
7 August 2021
Designer
Ui-ThemeZ

Project overview

The project involves the construction of GC-32 gathering center with a capacity of 120,000 barrels oil per day (bpd) located in the Burgan Oil Field. • LAN / WAN • Telephone System • PAGA • CCTV • Fiber Optic Cables • SDH/PDH, DWDM • SCS-IPLMS • EPS, PIR-PIDS System • GPS Systems

  • Oil & Gas and Utilities

Product making for
friendly users

Duis sed augue condimentum, blandit sapien in, accumsan eros. Curabitur sodales pulvinar libero et venenatis. Nullam eleifend risus a quam dictum auctor. Mauris at leo non dui euismod varius. Cras vel erat at est aliquam laoreet.

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

location

High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates

inquiry

info@elsewedy.com

+971 4 326 7744