L o a d i n g
High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates
Project

MAQTA Main Control Building

Category
Oil & Gas and Utilities
Client
Envato
Start Date
7 August 2021
Designer
Ui-ThemeZ

Project overview

Migration and upgrade of GASCO Pipeline Division Main Control building as blast-resistant coupled with associated infrastructure and Tie-ins with existing facilities. All existing control room equipment/panels will be migrated to the new building with zero shutdown. • SDH Transmission • CCTV, PAGA • Access Control • LAN/WAN • Leak Detection • Voice and Data • ICSS • Fire and Gas System • UPS, Lightning & Earthing • Audio Visual and Video Conferencing • Building Integration Management • Supervisory Monitoring

  • Oil & Gas and Utilities

Product making for
friendly users

Duis sed augue condimentum, blandit sapien in, accumsan eros. Curabitur sodales pulvinar libero et venenatis. Nullam eleifend risus a quam dictum auctor. Mauris at leo non dui euismod varius. Cras vel erat at est aliquam laoreet.

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

location

High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates

inquiry

info@elsewedy.com

+971 4 326 7744