L o a d i n g
High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates
Project

Obour City Water Network & Pump Stations

Category
Oil & Gas and Utilities
Client
Envato
Start Date
7 August 2021
Designer
Ui-ThemeZ

Project overview

Automation of new and upgraded Obour Water Network, The new water plant should better meet the current demand future expansion up until 10 years, Pump stations: 3 pump stations, each with a capacity of 6000 l/sec, and head pressures of 140m, 94m and 60m. • Supply, Design, Installation, and Commissioning of Instrumentation, SCADA. • Project Management, Documentation, Development, and inhouse Engineering. • Start-Up and Commissioning Services Onsite with Performance Testing (FAT & SAT).

  • Oil & Gas and Utilities

Product making for
friendly users

Duis sed augue condimentum, blandit sapien in, accumsan eros. Curabitur sodales pulvinar libero et venenatis. Nullam eleifend risus a quam dictum auctor. Mauris at leo non dui euismod varius. Cras vel erat at est aliquam laoreet.

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

Once the wireframe get approved at step 1, we’ll build prototype design to visually the idea

location

High Bay Building - Office 23 - First Floor - Nadd Hessa - Industrial Area - Dubai - United Arab Emirates

inquiry

info@elsewedy.com

+971 4 326 7744